Con Tech

Structural Renovation & Restoration

 

Click on pictures for enlargement

The 12 main support beams had rotted out to the point that the bridge was in immediate danger of collapse.

We braced the bridge, brought in a 70 ton crane and then removed the covered area of the bridge.

The original beams were replaced with laminated treated beams.

 

Last modified: 2009-03-25